EGNATIA MOTORWAY S.A.HYDRO DEMOLITION OF DRISKOS TUNNEL PIT
Our company has undertaken and successfully executed hydro demolition services of 30 cubic meters of concrete on the dome's tunnel pit of Driskos tunnel. For this project our company has used WOMA 700Z with jetting performance 1350 Bar, 200 lit / min, 650 Hp. The total duration of the project along with the installation of the equipment was 15 days.
MOTOR OIL S.A. TANK DECOLORIZATION & PAINTINGOur company has undertaken and executed paint stripping of a fuel tank (80 m diameter and 18 m height). For the paint stripping we used ultra high water jetting of 2500 bar and our new tech robotic system ENVIROBOT. This system uses water's ultra high pressure for surface's decolorization and has the ability to collect used water and rust oddments by vacuuming them into a special vessel where it separates from the contaminants, thereby achieving environmental protection. The permanent magnets bearing the robotic system retain it attached to surface, while it is driven by wireless control. For this project our company apart from the ENVIROBOT, used WOMA ECOMASTER TWIN JET with jetting performance 2500 Bar, 48 lit / min, 250 Hp and vacuum machine with suction capacity 1600 m3 / h and power 30 Kw.
|